Maximize efficiency with Morrison’s three lane, three screw stacking system, expertly designed to handle 16 oz tubs with precision and care. Each screw assembly operates at different elevations, enabling containers to form a three-container-high stack while maintaining positive control. This high-performance system processes 210 containers per minute across three lanes, delivering 70 stacks per minute into the sleever. Designed to handle full and capped containers delicately, it ensures product integrity while enhancing speed and productivity in your packaging line.