November 14, 2024
Video

Metering Powder Pucks

A manufacturer required 3” pucks metered at a 6.5” pitch for a downstream wrapper. Our engineers designed a dual straight-root timing screw drive unit, Morrison’s go-to timing screw design. With only three moving parts, it delivers reliable, easy operation, metering pucks seamlessly at discharge.

Related Videos
Metering for Downstream Capping
Metering for Downstream Capping
Metering Over a Keyence Printer for Date Coding
10
Metering Round Containers
9
Metering Pharma Bottles for Sleeving
8
Metering Glass Candles
7
Metering Full Bottles
5
Inverting Plastic Bottles for Air Rinsing
2
Inverting Glass Cups
Metering for Check Weighing
Metering for Check Weighing

Ready to work with Morrison?

Get a free quote.

Case Studies

Newsletter

Receive timing screw magic delivered straight to your inbox.