November 14, 2024
Video

Metering Powder Pucks

A manufacturer required 3” pucks metered at a 6.5” pitch for a downstream wrapper. Our engineers designed a dual straight-root timing screw drive unit, Morrison’s go-to timing screw design. With only three moving parts, it delivers reliable, easy operation, metering pucks seamlessly at discharge.

Related Videos
Metering for Check Weighing
Metering for Check Weighing
Metering for Capping
Metering for Capping
Metering Sauce Bottles
Metering Sauce Bottles
Dual Screw Metering Solutions
Dual Screw Metering Solutions
Metering Plastic Water Bottles
Metering Plastic Water Bottles
Metering Vitamin
Metering Vitamin Containers
Metering Random-Fed Ramen Cups
Metering Random-Fed Ramen Cups
neck banding
Metering Water Bottles for Neck Banding
salt and pepper
Metering Salt and Pepper Jars

Ready to work with Morrison?

Get a free quote.

Case Studies

Newsletter

Receive timing screw magic delivered straight to your inbox.