Beverage
Case Study

Stacked Metering Water Bottles

Customer Container Handling Challenge 

Our customer needed to accept a single lane of tall, skinny water bottles and metered to be at pitch for the downstream sleeving application.

Morrison Solution 

Due to the unstable nature of the tall containers, Morrison implemented a dual stacked timing screw system to enhance control and minimize the tipping risk. This dual system provides better stability for the bottles as they travel through and exit the screw, ensuring they are discharged at the specified pitch for the customer’s sleeving application.

Construction 

The timing screw drive unit was constructed with Black Anodized Aluminum.

Results

The dual stacked timing screw system for metering water bottles stabilized tall bottles, reducing tipping risk. Precise metering enhanced sleeving, improving efficiency, reducing downtime, and boosting output quality.

Ready to work with Morrison?

Get a free quote.

Beverage

More Case Studies

Newsletter

Receive timing screw magic delivered straight to your inbox.